Weather Forecast

Close
Advertisement

Highway 29 project south of Starbuck begins May 29

Email Sign up for Breaking News Alerts
News Morris,Minnesota 56267 http://www.morrissuntribune.com/sites/default/files/styles/square_300/public/fieldimages/1/0128/detour.jpg?itok=paoynA5k
Morris Sun Tribune
320-589-4357 customer support
Highway 29 project south of Starbuck begins May 29
Morris Minnesota 607 Pacific Avenue 56267

Motorists on Highway 29 between Starbuck and Benson will experience delays when a road resurfacing project and detour begin May 29.

Traffic will use a detour on Highway 28, Stevens County Road 1 and Highway 9 through late June while crews replace several culverts and repair frost heaves. Following the detour, crews will resurface the roadway, which will require lane closures with a pilot car operation.

Advertisement
Advertisement

A map of the detour is attached to this story.

All work is scheduled to be complete in mid-July, weather permitting. The project was originally scheduled to begin in mid-June, but favorable weather conditions will allow the contractor to start the project early.

The Minnesota Department of Transportation urges motorists to always drive with caution, slow down in work zones and never enter a road blocked with barriers or cones. For statewide travel information, visit www.511mn.org, call 5-1-1 or log on to www.mndot.gov.

Advertisement
news@morrissuntribune.com
Advertisement
Advertisement
randomness